Paproć 66H gas near-wellbore zone
As part of the Investment, NDI Energy constructed complete technological infrastructure for the extraction, pre-treatment and transmission of natural gas.
The investment task was carried out in the “Design and Build” formula, including the design of the facility and obtaining all necessary decisions, as well as comprehensive implementation of the process system, transmission pipelines and a system of connections that allow the well to be operated.
The scope of the investment project included the construction of the following facilities:
Paproć-66H near-wellbore zone – process container, instrumentation and control container and land development,
Construction of a complete process system for gas treatment from the P-66H well – gas heating, pressure reduction, separation of solid particles, dosing of hydrate and corrosion inhibitor, devices protecting against excessive pressure increase,
Construction of a DN80, PN100 gas pipeline between the planned Paproć-66H near-wellbore zone along with accompanying infrastructure – i.e. the designed DN50, PN100 deposit water pipeline and cable ducting with an optocommunication line of approx. 410 linear meters,
Inclusion of the designed pipelines (natural gas and deposit water) into existing pipelines in the Paproć-28 zone using hermetic technology.
The implementation of this investment project has a significant impact on increasing energy security in Poland.