Construction of the Strachocina-Pogórska Wola high-pressure gas pipeline
The investment task included the construction of a 97 km DN 1000 gas pipeline.
The project used modern CRC Evans welding technology, enabling automatic welding using six heads located inside the welded pipe and four heads on the outside. Special bevelling was also used, reducing the amount of additional material used four times.
Basic parameters of the investment project:
diameter: 1016 mm (DN 1000)
working pressure 8.4 MPa
length: 97.4 km
In addition to the gas pipeline itself, the investment project also included the construction of accompanying infrastructure, including a fibre-optic line, the construction of 6 stop and bleed units and the expansion of the Gas Transmission Station in Pogórska Wola.
The investment project was carried out in foothill areas, therefore, during the works, it was necessary to provide landslide protection to ensure the safety of the constructed infrastructure.
8.4 MPa – working pressure.
94.4 km – length of the gas pipeline section
1016 mm (DN 1000) gas pipeline diameter.
Investment location
Gazociąg wysokiego ciśnienia
Strachocina-Pogórska Wola