Yacht marina in Puck

The construction of part of the northern breakwater or a 180-meter-long permanent connecting pier with three floating piers for yachts are just some of the works that were included in the investment project in Puck.

The scope mainly included the construction of elements in the hydrotechnical structure, including the closing quay, the access pier and the northern breakwater, and then the delivery and installation of floating piers for anchoring of vessels.

Hydrotechnical works include, first of all, the installation of a sheet piling, constituting the basis for the structure of the pier and the breakwater, the construction of a reinforced concrete superstructure and stone riprap, as well as dredging works.

Among others, the northern breakwater and a 180-meter-long permanent connecting pier with three floating piers for yachts were built.

Power and water supply pedestals, stations with rescue equipment, ladders and mooring cleats were installed on the piers. 98 new moorings for yachts and the passenger fleet were built.