Passenger Pier and Wharf in Krynica Morska

The passenger pier has been extended by over 65 meters, and passenger ships of the White Fleet up to 36 m long can moor there.

Thanks to the alteration, the safety of vessels has also increased, as the extension of the pier has reduced waves inside the port.

Under the “Design and Build” formula, the embankment was also secured and the berth in the port of Krynica Morska was extended by 50 meters.

This part also included treatment works and strengthening of the eastern section of the Northern Basin (91 meters long) and the northern shore of the Northern Basin.

Almost 200 meters of the nearby road were paved and new lighting was erected. A parking lot for 22 cars has been prepared for motorists.

Investment location

Przystań Jachtowa Krynica Morska