realizations_business_areas

Construction

specializations_label

Railway infrastructure

responsible_companies_label

NDI S.A.

Balzola

realizations_investor

PKP Polskie Linie Kolejowe SA

Railway Line 29 Tłuszcz-Ostrołęka

The project assumed the preparation of the necessary design documentation for the task performed in the “design and build” system and the execution of construction works to achieve track parameters allowing for train traffic at a speed of 100 km/h on the Tłuszcz – Wyszków section and at a speed of 120 km/h on the Wyszków – Ostrołęka section.

The construction works included: alteration of a 6 km long track, renovation of crossings, renovation of engineering facilities, reconstruction of the Jarzębia Łąka passenger stop and installation of B class SSP equipment on four crossings to increase safety.

Lokalizacja inwestycji

Linia Kolejowa 29

Tłuszcz-Ostrołęka

See more projects