Modernization of the tram network in Częstochowa
The renovation of the track and catenary network covered an almost 14-kilometre section from ul. Fieldorfa-Nila to the bus terminal at al. Pokoju. The investment project was executed under the “design and build” formula.
The contract value amounted to PLN 114.5 million.
In Częstochowa, an almost 14-kilometre section from ul. Fieldorfa-Nila to the terminus at Aleja Pokoju was modernized.
NDI performed the work for the Municipal Transport Company. The investment project was carried out on the existing track system divided into sections, i.e.: 1, 2, 3, 4, 5a, 6.
It included the replacement of old track elements with new ones, but also the reconstruction of the linear tram infrastructure along with the catenary network, control, tram line cabling, road (vehicle) crossings and street furniture.